7. DC/2012/06 Shun Chi Court

Client: Drainage Service Department

Contract No.: DC/2012/06

Main Contractor:Welcome Construction Company Ltd.

Project Title / Location: Sewerage at Clear Water Bay Road, Pik Shui Sun Tsuen and West of Sai Kung Town.

Sub-contract Works: Laying of ID900mm, 1200mm, 1430mm and 1500mm Jacking Pipe by Tunnel Boring Machine TBM 900DH, 1200DHL & 1350DHL and installation of Sewerage Pipes inside the sleeve pipe

Total Length: 600m

Duration of works :2014 – 2017

 

Significant Works of TBM Pipe Jacking

The project located in Clear Water Bay Road, where ID900mm, ID1200mm, ID1430mm and ID1500mm Jacking Pipes were scheduled to lay for the installation of sewerage pipes. A Jacking Pipe, length 140m with internal diameter 1430mm, was carried out near Shun Chi Court by using TBM1350DHL. Geotechnical condition of the path was granite hard rock and the level between Jacking Pit at the higher position and Receiving Pit at the lower position was 11m different. Jacking Pipe pushed forward was 4.5 degree inclined angle, this required 79mm of Jacking Pipe descended in 1 meter. Although hard rock and inclined angle produced very high friction and gave difficulties to TBM control and pipe jacking operation, our working team resolved all problems and met the work schedule, counting on our experience and endeavor.