6. DC/2010/05 Sha Tin River
Client: Drainage Services Department
Contract No.: DC/2010/05
Project Title: Construction of Trunk Sewers underneath Channels in Sha Tin and Village Sewerage
Main Contractor: Welcome Construction Company Limited
Sub-contract Works: Laying of ID 600mm, 1200mm and 1500mm Concrete Jacking Pipes by Tunnel Boring Machine TBM600DH, 1200DHL, 1500DHL and installation of sewer pipes inside the sleeve pipes.
Total Length: 839m
Duration of works : 2011 – 2013
Significant Works of TBM Pipe Jacking
The main sections of pipe jacking works consists of
- Laying 240m long twin DN1500mm Concrete Jacking Pipes by Tunnel Boring Machine 1500DHL across Shing Mun River; the Jacking and Receiving Pits were constructed in appr. 17m depth at Tai Chung Kiu Road & Shatin Sewerage Pumping Station, where 13m head high pressure of underground water was encountered;
- Laying 83m long ID1200mm concrete jacking pipes by Tunnel Boring Machine 1200DHL across Siu Lek Yuen Nullah; the Jacking and Receiving Pits were constructed in appr. 11m depth adjacent to Ravana Garden river shore;
- Laying 143m long ID1200mm concrete jacking pipes by Tunnel Boring Machine 1200DHL across Fo Tan Nullah and along the channel side; the Jacking and Receiving Pits were constructed in appr. 8m depth near Fo Tan MTR Station;